Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114
1.Arrival of Two New HS-914 Long Range Scout Craft at Bay D6
2.Final Repairs on Orbital Broadcasting Unit in Service Room 4
3.Slow Approach of Parts Supply Ship on the Starboard Side of the Primary Communications Post
4.Launch of Belt Class Intelligence Probe from Bay A3
5.Listening to Solar Winds During Mid Shift Break
6.Incoming Communication from Satellite 2151 Alpha
7.Routine Calibration of the Hangar's Main Power Conduit
8.Encoded Message for High Command Clearance Level 8
9.Stealth Craft Engine Output Scan on Port Side
10.Shielding Raised Due to High Risk Analysis Determination
Length: 50:24

Tracklist
Length: 50:24

  1. Arrival of Two New HS-914 Long Range Scout Craft at Bay D6
  2. Final Repairs on Orbital Broadcasting Unit in Service Room 4
  3. Slow Approach of Parts Supply Ship on the Starboard Side of the Primary Communications Post
  4. Launch of Belt Class Intelligence Probe from Bay A3
  5. Listening to Solar Winds During Mid Shift Break
  6. Incoming Communication from Satellite 2151 Alpha
  7. Routine Calibration of the Hangar's Main Power Conduit
  8. Encoded Message for High Command Clearance Level 8
  9. Stealth Craft Engine Output Scan on Port Side
  10. Shielding Raised Due to High Risk Analysis Determination

Reviews for
'Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114'
'Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114'

There are no reviews for 'Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114' yet, stay tuned. Trusted Users can write album reviews.

Meanwhile, check out the existing Black Metal Album Reviews.



15 Hits

0 Comments
for 'Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114'

No comments yet.
Leave a comment
for 'Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114'

Leave a comment
for 'Zebulon Kosted - Nightshift at the Satellite Repair and Maintenance Space Hanger on January 4, 4114'

Create an account or log in to post comments.

Support Lycanthropia.net

Buy albums online through our site's links

Whenever you buy albums through our site, we receive a few cents for each sale, at no extra cost.

This helps us to stay online, and advert-free. Thank you for your continued support.

Report an error
Report an error on this page
Return to top
Page loaded in 0.30 seconds
Loaded in 0.30 s.